The venue was used for the 2012
Olympic and
Paralympic track cycling competition was held in the Velodrome with the adjoining BMX track hosting the Olympic BMX competition.
Team GB dominated the track cycling competition winning seven out of a possible ten gold medals plus one silver and one bronze. The GB Paralympic track cycling team won a total of 15 medals, comprising five golds, seven silver and three bronze. The Eastway Cycle Circuit was demolished for the VeloPark before being merged with the new park. It was announced that along with the VeloPark there would be three new cycle circuits created around London. By mid-February it was announced that Hog Hill would be the temporary relocation of the Eastway Cycle Centre. The promised
cycle speedway track will not be built. In August 2011 it was announced that the road race course will be rerouted to allow more space and parkland after suggestions from
Sport England and
British Cycling. The course will now cross the
River Lee and parkland linking up with other cycle routes in London. British Cycling will remain based at the Olympic-standard
Manchester Velodrome which has been a catalyst for the success of British Cycling in recent years, most notably at the
2008 Olympic Games. Team manager of British Cycling,
David Brailsford has stated that the new indoor
National BMX Arena in Manchester and the undulating terrain of
North West England, ideal for practising road race cycling, offer a distinct advantage over London. An agreement was struck in 2012 to bring track cycling to the London Velodrome post-2012 Olympics, with events such as
Revolution series which have proved popular in Manchester. In September 2013 the UCI announced that the Velodrome will host the
2016 UCI Track Cycling World Championships. The
London Development Agency (LDA) have funded a new permanent road cycle circuit and mountain bike course at the
Redbridge Cycling Centre, costing £5m. The
London Borough of Redbridge will be funding the facility up to the completion of the legacy London Velopark. Work is underway to identify an operator of Hog Hill beyond 2012. ==Later events==