Lesmahagow Railway

The Lesmahagow Railway, south of Glasgow in Scotland, was developed by a company known as The Lesmahagow Branches. It was not an independent company in the usual sense. It was a financially independent, self-contained unit within the framework of the Caledonian Railway (CR). The shareholders and officers of both companies were mainly the same people. The line was built largely to transport the vast amount of coal being produced by the many mines in the area. Authority to build the line was given in the Caledonian Railway Act 1847 but construction did not commence till 1854. In 1856 the line was opened in stages. Later there was found to be a demand for passenger services which commenced in 1868. In 1923, with the grouping, the CR amalgamated with several other companies to form the London, Midland and Scottish Railway (LMS) which, following nationalisation in 1947, became part of British Railways.

Branches
Coalburn Branch From Lesmahagow railway station to Bankend railway station. Stonehouse Branch Separates from the Coalburn branch at Dalserf Junction. Blackwood Branch Separates from the Coalburn branch at Southfield Junction. Swinhill Branch Built for Swinhill Colliery, the branch reaches Stonehouse Junction. ==Construction==
Construction
There were major difficulties building the line as, following rain, the ground took up the appearance and consistency of black mud. The line was built over a vast coalfield. In between the coal were large deposits of various other valuable minerals. There were several landslips as the embankments were being built. Two large viaducts had to be constructed – one at Nethan and another near Hamilton. The former had to be re-constructed a few years following the opening as the heavy coal trains were causing considerable damage. It had been built on a very low budget, and it was too low. Consequently, the approaches on both sides were very steep. In a costly rebuild iron piers were inserted between the existing stone ones and the rail level was raised by permitting an easing of the approach gradients. Even then the Nethan viaduct was a fragile structure and one of the highest in Scotland. A speed limit was imposed on it. It was demolished in 1955. ==Running==
Running
From the start the line was extremely busy with mineral traffic. At one stage, eight engines were required to work the line and, owing to the weight of the coal being transported, they had to be the most powerful available. A large quantity of cannel coal was transported. This was a highly volatile mineral that was in demand by the gas industry. Apart from coal, several other minerals were found in the area, and transportation by rail was the preferred option. These included ironstone, limestone and sandstone. When passenger trains were introduced they were widely used by people travelling to and from work. ==References==
tickerdossier.comtickerdossier.substack.com