Line 1 (Lanzhou Metro)

Line 1 of the Lanzhou Metro is a subway line in Lanzhou, China running from Donggang to Chenguanying. It has 20 stations and is 25.9 kilometres (16.1 mi) long. It opened on 23 June 2019.

History
Line 1 started construction on July 9, 2012. Line 1 is with 20 stations. The line is completely underground. Line 1 opened on 23 June 2019. The stations are fitted with platform screen doors. The China Association of Metros (CAMET) has awarded an innovation award for the techniques used for the tunnel sections of Line 1's first phase under the Yellow River. Line 1 is the first subway in China to tunnel under the Yellow River. Opening timeline ==Stations==
Operation
The line averaged 230,800 passengers daily during October 2020, with the busiest station being North Square of Lanzhou West Railway Station followed by Xiguan and Lanzhou University. Fares The fare price is distance based as following: Service Trains run between 6:30 until 22:00. The travel time between the two termini is roughly 45 minutes. It is understood that the initial operation time of Line 1 is from 6:30 to 22:00, and the daily operation service is 15 hours and 30 minutes. The single-line operation time is about 45 minutes, giving an average travel speed of . == Notes ==
tickerdossier.comtickerdossier.substack.com