After purchasing the land surrounding the line at Edge Green in 2011, PF Jones Ltd worked with Hansons to restore the Kelbit line off the Haydock Branch Curve. The Kelbit line was reopened in 2018 and is used by Heidelberg (formerly Hanson) to transfer raw materials from Shap Quarry, Cumbria to distribute across the north west. Between and Golborne and Glazebrook
High Speed 2 proposed use of an alignment similar to the disused line in Phase 2b. This "Golborne Link" was removed from HS2 plans before the northern leg was abandoned by the Conservative government in 2023. ==References==