Two large factories, Color and Donit, are based in Medvode. The
Sava River at Medvode is also the location of the
Medvode Hydroelectric Power Plant. The hydroelectric plant was built in part using forced labor by Catholic priests held as political prisoners after the Second World War. There are a total of 1570 companies registered in Medvode that generate a total of 454,714,000€ annually. Previously, there was a
lead and
quicksilver mine in Ločnica Valley, to the south of Medvode. In the 19th century, the town was increasingly famous to cities as far as Vienna as a tourist spot. The Sora River once attracted many bathers. During summers, a special vacations train connected the town with Kranj and Ljubljana. In 2018, a total of 35,802 tourists spent their nights in Medvode, including 33,966 foreign and 1,836 Slovene ones. ==References==