MAST MAST was designed to confirm the results of the earlier
Small Tight Aspect Ratio Tokamak (START) experiment (1990-1998) in a larger, more purpose-built experiment. The MAST design phase occupied 1995-1997, with construction beginning in 1997, and the first plasma obtained in 1999. The first results of the MAST demonstrate that
H-mode is reached with more ease and less energy than expected with a considerable improvement in confinement, a fundamental point for any energy production scenario. Finally, different scenarios have been successfully tested to decrease the energy flow in the central solenoid vs plasma current, which represents another fundamental point for designing a demo spherical tokamak. Over its lifetime MAST produced 30,471 plasmas (in pulses up to 0.5 sec). In October 2013 the reactor was shut down for the upgrade to MAST Upgrade.
MAST Upgrade MAST Upgrade is the successor experiment to MAST, also at Culham Centre. The upgrade, which cost £45M, started in 2013 and was expected to significantly exceed MAST’s heating power, plasma current,
magnetic field and pulse length. MAST Upgrade began operation on 29 October 2020. One of MAST Upgrade's most notable features is the Super-X divertor. The divertor removes excess heat and impurities from the plasma. Conventional divertor designs, at powerplant scale, will experience high heat loads and will need to be regularly replaced. The Super-X divertor was expected to produce heat loads that are lower by around a factor of ten and has been seen as initially successful. In 2025 researchers announced the first use of Resonant Magnetic Perturbation coils to apply a 3D magnetic field and stabilise plasma in a spherical tokamak plasma. The technique was able to completely suppress disruptive Edge Localised Modes. In addition, they claimed to be able to independently control the plasma exhaust in the upper and lower divertors in MAST Upgrade without impacting plasma performance or density. Nitrogen injection at the plasma edge was reported to more evenly distribute energy across plasma-facing components, preventing excessive heat concentration. Also, they claimed to have set a record for injecting 3.8 megawatts into the plasma using neutral beam heating. The team also reported the best plasma shape yet, with the plasma height reaching 2.5 times its width.
Spherical Tokamak for Energy Production The design of the next generation
Spherical Tokamak for Energy Production (STEP) began in 2019 with £220 million in government funding. The plan was to begin operations in the 2040s. The current plan does not include a tritium generation facility. ==See also==