Ministry of Railways built a 172 km
broad-gauge railway. The railway line starts from
Dhaka, capital of Bangladesh to
Jessore. Under the Railway Link Project of
Padma Bridge, 14 railway stations will be built and 6 railway station will be repaired. 310 rail bridges will be built for the new railway line. 66 of 310 are major and 244 are minor bridges. As part of this project, a railway station is under construction at Durgapur in
Narail which was expected to be completed by April 2024. However it was completed on December 24, 2024. ==References==