The first two cars entered service in 1961 on the
Goulburn Day Train with a
U set trailer, before all entered service in March 1961 on the train they were built for, the
South Coast Daylight Express. The set generally operated with four carriages. However, PHB 1141 was sent to the Commonwealth Engineering plant at Granville for the fitting of
Cummins engines and
Voith transmission, but was destroyed by fire during the conversion. Following the cessation of the South Coast Daylight Express in January 1991 they were redeployed to operate services on the
Main South line to
Moss Vale and
Goulburn. Following their replacement by
Endeavour railcars in 1993, all five members were scrapped in January 1994. ==References==