Chief minister
Nitish Kumar laid the foundation stone of the bridge in August, 2015. Upon completion in July 2025, the bridge will reduce the load on
Mahatma Gandhi Setu and will also reduce the traffic in the capital city of
Patna. The concrete-laying in a well foundation starting on 19 July 2017 on the
Raghopur side. 67 well foundations would be constructed in Ganga while total 20 well foundations will be laid in 'Diyara' area of both sides of Ganga. A JV of Daewoo E&C from Korea with Indian homegrown major L&T Construction is executing the Rs 3,115 crore bridge project which will be the longest bridge in India. A bridge has been planned across the Ganges to connect
Arrah and
Chhapra. A road bridge parallel to the existing rail and road bridge, Rajendra Setu, has also been planned. The bridge will also require construction of of approach roads on both ends of the bridge. ==Construction==