NuScale Power Corporation is a publicly traded American company that designs and markets small modular reactors (SMRs). It is headquartered in Tigard, Oregon. The company's VOYGR power plant, which uses 50 MWe modules and scales to 12 modules, was the first SMR to be certified by the US Nuclear Regulatory Commission (NRC) (2022). The newer 77 MWe module designs, known as the VOYGR-4 and VOYGR-6, were submitted for NRC review on January 1, 2023, and approved May 29, 2025. NuScale is now seeking NRC approval for their 12-module, VOYGR-12. The SMR is also scalable, offering up to 924 MWe.

History
NuScale was founded based on research conducted by a team of nuclear scientists at Oregon State University (OSU) and the Idaho National Laboratory (INL) and funded by the United States Department of Energy (DOE) beginning in 2000. OSU researchers, headed by José N. Reyes Jr. developed a prototype SMR in 2007, which NuScale Power used to develop its prototype. Much of the research was performed at OSU's Multi-Application Small Light Water Reactor (MASLWR) test facility starting in 2007, with full-scale prototype testing performed in Idaho at the INL in 2013. DOE funded the research from 2000 to 2003. The same year Oregon State University constructed its one-third-scale reactor test facility (MASLWR), the university founded NuScale Power. Joint research between OSU and NuScale soon followed. As compensation for past research, OSU offered researchers opportunities to exchange patents for an equity stake in the new company. NuScale was the first to submit small reactor plans to the NRC It was evaluated by a consortium of utility companies called Energy Northwest. Funding difficulties and rebound In January 2011, NuScale's largest investor, Kenwood Group, was investigated by the U.S. Securities and Exchange Commission (SEC) and later pleaded guilty to operating a Ponzi scheme. The SEC investigation was not related to Kenwood's dealings with NuScale, but Kenwood's assets were frozen just as NuScale was expecting additional funding. The company started making staffing and pay cuts as executives looked for new funding sources and most of the company's employees were laid off. That September, NuScale obtained a loan to re-hire 60 employees. In October, Fluor Corporation acquired a majority interest in the company for $3.5 million and promised almost $30 million in working capital. According to The Energy Daily, Fluor's investment saved the company, which had been "financially marooned" by its prior investor. A separate agreement gave Fluor the rights to construct NuScale-based power plants. In August 2012, Rolls-Royce Holdings said it would support NuScale's commercialization efforts and help it obtain funding from DOE's funding opportunity announcement. It was not funded in the first DOE's round. In the second round in December 2013, NuScale won up to $226 million in "cost-sharing" funding to share the expense of obtaining government approval, through the SMR Licensing Technical Support program. This was followed by an agreement in May 2014 for up to $217 million in funding over a five-year period, whereby DOE would match private funding. In September 2020, the U.S. Department of Energy reported that it had provided more than $400 million since 2014 to support the NuScale development and that of other earlier stage domestic SMR designs. In May 2022, NuScale completed a merger with the special-purpose acquisition company (SPAC), Spring Valley Acquisition Corp, raising $380 million of investment. NuScale Power Corporation then listed on the New York Stock Exchange. In September 2022, NuScale entered into an alliance with ENTRA1 Energy and the private asset management firm Habboush Group to commercialize the NuScale SMR. In May 2025, the relationship was described as "ENTRA1 Energy is NuScale's partner and independent power plant development platform, which holds the global exclusive rights to the commercialisation, distribution, and deployment of NuScale's SMRs." NuScale Power now limits itself to the production of the SMR modules rather than entire power plants. ENTRA1 and NuScale own a joint venture company, ENTRA1 NuScale LLC. The plant was for Utah Associated Municipal Power Systems (UAMPS), a subdivision of the Government of Utah, on the Carbon Free Power Project (CFPP). UAMPS operates power plants in Wyoming, New Mexico, California, and Utah, selling to local utilities. The DOE could provide supporting funds of about $140 million/year over 10 years, awaiting more Congressional support. The company submitted designs to the NRC in January 2017 for a 12 reactor power plant producing 570 MWe at a build cost under $3 billion. In 2020, DOE approved a $1.355 billion cost-share award. As of 2021, 8 cities had withdrawn from CFPP. In July 2021, the proposal was downsized to 6 reactors, and the expected electricity price increased to $58/MWh (¢5.8/kWh). In January 2023, CFPP approved a new Budget and Plan of Finance, establishing a target price of $89/MWh (¢8.9/kWh) after an estimated $30/MWh generation subsidy from the 2022 Inflation Reduction Act (IRA). The projected build cost had increased to $9.3 billion for 462 MWe generation capacity from $3.6 billion for 720 MWe in 2020. $4.2 billion of the cost would be covered by the DOE and IRA support, leaving $5.1 billion of acquisition and construction costs to be covered by UAMPS members. In November 2023, UAMPS announced it was unlikely that the project would have enough subscription to continue due to cost increases, and UAMPS and NuScale jointly decided to cancel the project. Following the cancellation, NuScale laid off 154 of its staff (28%) as part of "taking steps to transition from R&D to commercialization". Doicești, Romania In November 2021, NuScale announced its intent to build with Nuclearelectrica its first reactors in Romania by 2028. On December 28, 2022, Romanian company RoPower Nuclear contracted for Front-End Engineering and Design. The location was expected to be at Doicești Power Station, a former thermal power station. RoPower is a joint venture between Nuclearelectrica and Nove Power & Gas. On July 25, 2024, RoPower Nuclear and Fluor Corporation signed the second stage Front-End Engineering and Design (FEED 2) contract, for the planned SMR project in Romania which will provide updated cost estimate and other analysis for a final investment decision. The Export–Import Bank of the United States approved a $98 million loan to RoPower Nuclear to support this design study, which would support 400 US jobs. In February 2026, Nuclearelectrica made a decision in principle to invest in a 6-module NuScale SMR, subject to devising a funding plan. The Romanian Prime Minister Ilie Bolojan estimated the cost at $6-$7 billion and said "the complexity of such projects and the technology being in early days, I estimate we will not see the investment immediately." RoPower Nuclear will only pay for the first reactor module with NuScale responsible for the other five until the first module demonstrates full operation, which is planned for July 2033. Other plans In March 2012, NuScale signed an agreement with DOE that allowed NuScale and two partners to build and operate a NuScale-based nuclear power plant at a Savannah River site in South Carolina. The following month, Energy Northwest said it had no immediate plans to construct a nuclear power plant, but had evaluated all the available SMR technologies and identified NuScale as the best available option. In July 2013, NuScale announced an effort to demonstrate NuScale reactors in the western United States, called Program WIN (Western Initiative for Nuclear), In August 2020, the NRC issued a final safety evaluation report, certifying the design as having met safety requirements. In February 2022, NuScale and mining conglomerate KGHM announced a contract to construct an SMR in Poland by 2029. In April 2023, an application for a decision-in-principle to permit the project was submitted to the Polish government. In January 2023, the NRC certified NuScale's 50 MWe design, known as the VOYGR, for use in the US. However this was for an earlier version of the design to the current 77 MWe design. The module and plant designs were resubmitted to the NRC in January 2023 for NuScale Power's four and six-reactor configurations, known as VOYGR-4 (US300) and VOYGR-6 (US460). In its acceptance review of the application, the NRC identified a number of sufficiency issues in the application, and requested supplemental information be supplied before NRC staff could accept the application for docketing and detailed technical review. The supplemental information was supplied in July 2023, and the NRC estimated the evaluation would be complete in July 2025. In May 2025, NuScale successfully obtained NRC-US licensing for their 77 MWe module and the two new plant configurations. On August 29, 2024, Nuclear Power Ghana and Regnum Technology Group signed an agreement to build a 12-module nuclear power plant in Ghana during the US-Africa Nuclear Energy Summit in Nairobi, Kenya. In January 2025, an SMR simulator training centre was opened in Ghana, to train and educate the next generation in operating future civil nuclear reactors. In 2023, NuScale submitted a new design for NRC approval to license its VOYGR-12. As of 2025, the 12-module, 924 MWe reactor design remains under NRC review. ==Reactors==
Reactors
NuScale reactors take 1% of the space of a conventional reactor and generate 77 MWe. and assembled on-site. The latest NRC approved power module delivers 77 MWe (gross), or about 73.5 MWe (net), and require refueling with standard 4.95 percent low-enriched uranium-235 fuel every two years. In the event that power is lost for normal cooling systems, the water in the pool absorbs heat and boils. In normal operating conditions, the module's containment-vessel-pressure remains near vacuum, which eliminates convection and provides simpler heat transfer conditions. The effect also reduces component corrosion and improves instrumentation reliability. The company estimates a twelve-unit NuScale plant would cost $4,200 (an earlier estimate was $5,000) per kilowatt. In comparison, the Energy Information Administration in 2013 estimated overnight costs to be $4,700 per kilowatt for conventional nuclear power, $4,600 for a carbon sequestration coal plant and $931 at a gas-fired plant or in excess of $1,800 for a gas-fired plant with carbon sequestration (all 2011 dollars). With the steam generators internal to the movable steel reactor assembly, the SMR does not have a large concrete secondary containment building as used in large PWRs. There is a single control room for up to 12 reactors. One disadvantage of the design is that the reactors lie in a large pool of water, for emergency cooling, and this pool requires much more reinforced concrete per MWe produced than a conventional nuclear reactor building, adding considerably to cost. New Scientist reported peer‑reviewed analysis from Stanford University that assessed nuclear waste production from SMR reactors and concluded that "SMR performed worse on nearly all of our metrics compared to standard commercial reactors". The results of the study were rejected by NuScale as based on outdated information. Intellectual Ventures, OPEN100, Westinghouse Electric Company, Terrestrial Energy, and X-energy. Safety concerns In March 2020, a panel of independent experts from the NRC's Advisory Committee on Reactor Safeguards (ACRS) claimed to find reactor design flaws. The main issue was that in the event of an emergency shutdown condensed steam returning to the reactor vessel would be low in boron and might not absorb enough neutrons. NuScale modified its design to ensure that more boron would spread to the returning water. ACRS was concerned that operators could accidentally add deboronated water to the core. The panel found other problems: the steam generator could be prone to damaging vibrations. However, on July 29 ACRS recommended that the safety evaluation report be issued and the reactor be certified. ==Operations==
Operations
NuScale has offices in Tigard, Oregon; Corvallis, Oregon; Charlotte, North Carolina; and Rockville, Maryland. Its headquarters are in Tigard, while its factory is in Corvallis. It maintains a test facility at Oregon State University and in Italy. The company is publicly traded as SMR on the New York Stock Exchange. == See also ==
tickerdossier.comtickerdossier.substack.com