MarketOlkaria V Geothermal Power Station
Company Profile

Olkaria V Geothermal Power Station

The Olkaria V Geothermal Power Station, also known as the Olkaria V Geothermal Power Plant is a power station in Kenya, with an electric capacity of 158 megawatts (212,000 hp).

Location
The power station is located in the Olkaria area, in Hell's Gate National Park, in Nakuru County, approximately , by road, southeast of the city of Nakuru, where the county headquarters are located. Olkaria V Geothermal Power Station is located approximately , by road, northwest of Nairobi. The geographical coordinates of the power station are:00°54'59.0"S, 36°21'02.0"E (Latitude:-0.906944; Longitude:36.323333). ==Overview==
Overview
The Olkaria 5 project generates 140 MW, although other reliable sources have put planned capacity at . The power station is jointly financed by the Japan International Cooperation Agency (JICA) and the Kenya Electricity Generating Company (KenGen). The budgeted cost is Sh40 billion (US$400 million). The Olkaria V plant in Great Rift Valley, Kenya was first synchronized to the National Grid on 28 June 2019 and its first unit has reached its full design output of 79 megawatts. A second unit came online in October 2019, bringing Kenya's total geothermal capacity to between 700MW and 850MW. ==History==
History
Olkaria 5 power plant is another in a series of six geothermal stations either planned or already operational in the Olkaria area in Nakuru County. Construction began in April 2017. Completion and commercial power production began in 2019. ==Ownership==
Ownership
Olkaria V Geothermal Power Station is wholly owned by the Kenya Electricity Generating Company (KenGen). ==See also==