One Angel Square is a high-rise office building in Manchester, England. Construction work began in 2010 and was completed in February 2013. The landmark building is the head office of the Co-operative Group. Standing 72.5 metres (238 ft) tall, the building forms the centrepiece of the £800 million NOMA development in the Angel Meadows area of Manchester city centre. The building cost at least £105 million to construct and was sold on leaseback terms in 2013 for £142 million.

History
image of the proposed design, announced in May 2009. Background The Co-operative Group announced plans to move from its headquarters on Miller Street and Corporation Street to a new site in the Greater Manchester area in 2008. From 2008 to 2011, the group grew strongly according to CEO Peter Marks, membership doubled to six million and revenue and profits also doubled. Takeovers of Somerfield and the Britannia Building Society fuelled impetus for new head offices to accommodate the growth. In December 2008, the group announced it would remain in Manchester city centre and would regenerate land opposite its Miller Street base. The new building is close to Angel Meadow, the site of a 19th-century slum once described by Friedrich Engels as "hell on earth". Archaeologists conducted a survey in 2010, which continued into 2012. The CIS Tower and the Co-operative Bank's Balloon Street headquarters were unaffected by the development. the Dantzic, Hanover, Redfern and Federation Buildings were subsequently vacated and renovated for let. In 2011, the Co-operative announced the NOMA (North of Manchester city centre) project, to regenerate a site with office, retail, residential and hotel space to encourage visitors from the city centre. Manchester City Council contributed £20m to the project as an incentive for redevelopment. In December 2011, the Co-operative announced its new headquarters would be known as One Angel Square. The first task was installing the 539 pile foundations - each at an average depth of . Work soon began on assembling the 3,300 tonnes of steel and 1,948 coffered concrete floor slabs which make up the structure of the building. Specialist services were supplied by Buro Happold for structural and fire engineering More than 4,000 workers from over 90 companies were involved in the building's construction, making it the largest building site outside South East England. The building was topped out in November 2011 and work began assembling the bronze-coloured diagonal panels of the exterior façade. The panels were installed using roped access techniques. An estimated £17m of building materials out of the total £100m cost was locally sourced, reducing embodied energy and minimising environmental impact. Mecanoo and Manchester-based Royal Haskoning designed the landscape in front of the building. however opening was postponed to 2013 due to delays in the fitting out process. The leaseback sale attracted nine bids from six continents. In February 2013, the Group sold the building for £142 million to DWS and Gingko Tree Investments, an investment arm backed by the Chinese sovereign wealth fund. ==Architecture==
Architecture
The Manchester division of 3DReid designed the building with a brief to create a green, landmark building for the city. The building's distinctive form was conceived in a notebook sketch by the lead architect for the building, Mike Hitchmough. The form was refined and developed, before being unveiled to the public in May 2009. The building's interior primarily consists of open plan space and can accommodate up to 4,000 staff. The building has of total space – approximately per floor. Form The form of the building is based on a beehive, a symbol long associated with the Co-operative movement and used on its buildings. It has been nicknamed the 'sliced egg' because of its distinctive shape. Steel was utilised as the building main material; its strength allows for large column-free floors needed in an open plan building. The building's form has been compared with The Ark and City Hall in London. In December 2011, the building achieved the highest recorded BREEAM score, making it one of the most sustainable large buildings in the world. The building's sustainable cogeneration heat and power plant uses bio-fuel and waste cooking oil. Its computer systems will recycle waste heat. The building has a used water recycling system and rainwater harvesting. Thermal mass materials which have a high density such as concrete are used to control temperature fluctuations. ==Awards==
Awards
One Angel Square is the only commercial building in the United Kingdom to achieve maximum ratings in energy and sustainability performance by the three main rating systems. It has BREEAM 'Outstanding' accreditation and an A-rated Energy Performance Certificate and Display Energy Certificate. The building has been awarded: • Considerate Constructors Scheme – 'Gold' award (2011) - Construction was rated 38.5 out of 40 by the Considerate Constructors Scheme, and achieved perfect scores in five of eight categories. • Builder & Engineer Awards (2011) • Sustainable Project of the Year • Architect of the Year – 3DReid • Green Apple Awards (2012) • Bronze Award • Property Week Awards (2012) • Sustainable Achievement Award • World Architecture Festival (2012) – shortlist • 'Future Project – Office' category • BREEAM Awards (2013) • Best Office Building • MIPIM Awards (2013) • Best Office and Business Development – Final four shortlist ==See also==
tickerdossier.comtickerdossier.substack.com