Projected and built by the Malatya Metropolitan Municipality in cooperation with the
Ministry of Youth and Sports, the construction of the Orduzu Sports Complex started in 2021. Stretching over land, the total covered area of the buildings is . It was completed in the fall of 2023. The complex features a sports hall with 5,000 seating capacity for basketball and volleyball games, an
artistic gymnastics hall for 500 spectators, training halls, football fields, basketball courts, tennis courts, and hosts an
Olympics Preparation Center (TOHM). In addition, it has a cafeteria, a 16-room accommodation center and car parking lot. == International events hosted ==