The demand for
jute was increasing all over the world. For the purpose of meeting that growing demand, there was a need for better communication system than the existing communication system to supply jute from Eastern Bengal to
Port of Kolkata. Therefore in 1885 a 144 km wide meter gauge railway line named Dhaka State Railway was constructed to bring raw jute to Kolkata mainly by river which connects
Mymensingh with
Narayanganj. Pagla railway station was built as part of the project during the construction of
Narayanganj–Bahadurabad Ghat line. == References ==