The project consists not only of the power plants themselves, but also will include the construction of a jetty for exclusive use of the power plant for coal importation. The estimated annual coal consumption for the plants will be 4.66 million tons, and enough annual power for an estimated 3-4 million households will be generated. The plants each consist of one boiler, steam turbine and generator, and are fueled by sub-bituminous coal which is offloaded at the project's coal jetty. Electricity will be connected to the electric grid network
K-Electric via a 500 kilovolt AC transmission line. The plant's gross efficiency is equal to or greater than 41%, while the net efficiency is equal to or greater than 38%. Additionally, living quarters for up to 700 full-time workers were constructed at the site, with additional temporary housing facilities for 11,000 construction workers divided into a unit for 2,000 Chinese construction workers, and another unit for 9,000 Pakistani construction workers, with all construction materials for living quarters provided by Chinese manufacturers. ==Coal Source==