Palermo CentralePunta Raisi Improvements on this line began 22 February 2008. • A second track is planned for the Palermo-Trapani route, which currently is only a single track between the Orleans and Carini stations. With the new track in place, there will be an increase in the number of trains and a reduction in journey times. • The work includes removing all level crossings by lowering the track in some sections of the line and the construction of overpasses at other sections, constructing whichever is best at that location. • Twelve stops will be added with new stations at Ficarazzi, Roccella, Guadagna, Palazzo di Giustizia, Lolli, Lazio-Restivo, Belgio, La Malfa, Sferracavallo, Kennedy, Torre Ciachea and Orsa. • The line will also be extended to Ficarazzi, with connections through to Messina.
Palermo NotarbartoloGiachery This route was repaired in 1993. • The line will be completely transformed, forming a complete ring known as the
Palermo Rail Ring, extending from Giachery to Notarbartolo with new stops at Porto and Malaspina Politeama-Catania. • The new route will be underground. • A new stop will open Lazio Libertà. • This line will not get a second track. • Work has stopped temporarily due to an appeal made by the firm that came in second when the contract was awarded. == See also ==