MarketPrima-class cruise ship
Company Profile

Prima-class cruise ship

Prima-class cruise ships, formerly known by the project name Project Leonardo, are a class of cruise ships built for Norwegian Cruise Line (NCL). These are the first NCL ships to be built by Fincantieri. Each ship is expected to cost about $850 million. The modifications that are to be made to the design of the future Prima-class ships would result in an extra 1.2 billion euros in shipbuilding costs — about US$1.27 billion.

History
Norwegian Cruise Line (NCL) ordered four ships in February 2017, with an option for two more ships, under the project name "Project Leonardo". The ships should be delivered in the years 2022 to 2026, the optional ships up to 2028. In July 2018, the cruise line confirmed its order for the fifth and sixth cruise ships under Project Leonardo. They are expected to join the NCL's fleet in 2026 and 2027 respectively. ==Ships==
tickerdossier.comtickerdossier.substack.com