According to the 2010-11 Budget, rail proposals were as follows: • To build separate platforms for –/ services and increase the frequency to 30 min during peak hours and 45 min other time. • Introduction of shuttle service on ––/ Sector. This will operate every 3 hours with 2/3 wagons for goods. • Third track for – section. (Demand survey accepted in Budget 2011-12) • To increase two terminals on – and – sections. • To start suburban service on –
Rajgurunagar station (Proposed) patch after completion of – , railway for connectivity with
New Pune International Airport. A new EMU terminal is proposed to be built on west of the existing station. It will have two lines and three platforms. This proposal includes: • Extension of existing platforms to accommodate 24 bogie trains. • A new terminal for EMU to accommodate 15 bogie trains. • Three foot over-bridge to connect new terminal to other platforms. • Expansion of for new trains to origin and terminate at the station. == See also ==