The Ormen Lange field has been developed without using conventional offshore platforms. Instead, 24 subsea wellheads in four seabed templates on the ocean floor are connected directly by two pipelines to an onshore process terminal at
Nyhamna. After processing, the gas is exported by the world's second longest subsea gas pipeline -
Langeled pipeline - approximately from Nyhamna to
Easington in
England. The northern section of the export pipeline has a diameter of , and the section from Sleipner to Easington has a diameter of . The field produces 70 million cubic meters of
natural gas per day. Total cost is estimated to reach 66
billion Norwegian kroner (around
US$12 billion) by the time of completion. The onshore facility at Nyhamna was designed by
Aker Solutions Engineering in 2003-2007. ==Natural conditions==