• Essential Air Service documents (Docket OST-2008-0201) from the
U.S. Department of Transportation: • 90-Day Notice (June 26, 2008): from Warbelow's Air Ventures, Inc. of its intent to terminate essential air service ("EAS") between Fairbanks and Rampart, Alaska (unable to operate this service economically without a subsidy). • Order 2008-7-7 (July 3, 2008): the department is prohibiting Warbelow's Air Ventures, Inc., from suspending service at Rampart, Alaska, and requesting proposals by July 31 from carriers interested in providing replacement essential air service. • Order 2008-9-20 (September 16, 2008): selecting Warbelow's Air Ventures, Inc., to provide subsidized essential air service at Rampart, Alaska, for the two-year period from September 24, 2008, through September 30, 2010, at an annual rate of $86,701. • Order 2010-7-10 (July 15, 2010): re-selecting Warbelow's Air Ventures, Inc., to provide essential air service (EAS) at Rampart, Alaska, at an annual subsidy rate of $97,679 from October 1, 2010, through September 30, 2012. • Order 2012-10-14 (October 11, 2012): re-selecting Warbelow's Air Ventures, Inc., to provide Essential Air Service (EAS) at Rampart, Alaska, for $76,416 annually for two nonstop round trips per week to Fairbanks with Piper Navajo equipment through October 31, 2014. ==External links==