Trail run of the world's first double-decker cargo liner train, which can haul passengers as well as cargo at 180kmph. Trail run of world's first triple-stack container train. Design and specification of 12,000 hp
WAG-11 electric locomotive. Design and specification of
Vande Bharat Design and development of dual purpose
Double Decker Express for cargo as well as passenger. Design and specification of
WDAP-5 Design and specification of
Utkrisht Double Decker Development of design & specification of
WAG-12 Development of
Double Decker Express Design of
WAGC3 locomotive Development of a new crashworthy design of 4500 HP WDG4 locomotive incorporating new technology to improve
dynamic braking and attain significant fuel savings. Development of Drivers’ Vigilance Telemetric Control System, which directly measures and analyses variations in biometric parameters to determine the state of alertness of the driver. Development of
Kavach. Development of Computer-Aided Drivers Aptitude test equipment for screening high-speed train drivers for Rajdhani/Shatabdi Express trains to evaluate their reaction time, form perception, vigilance, and speed anticipation. Assessment of residual fatigue life of critical railway components like rail, rail weld, wheels, cylinder head, OHE mast, catenary wire, contact wire, wagon components, low components, etc., to formulate remedial actions. Modification of the specification of the Electric Lifting Barrier to improve its strength and reliability. Design and development of modern fault-tolerant, fail-safe, maintainer-friendly
Electronic Interlocking system. Development of a 4500 HP Hotel Load Locomotive to provide a clean and noise-free power supply to coaches from the locomotive to eliminate the existing generator car of Garib Rath express trains. Field trials were conducted for electric locomotive hauling Rajdhani/Shatabdi express trains with the Head On Generation (HOG) system to provide a clean and noise-free power supply to the end coaches. Development of WiMAX technology to provide internet access to the passengers in running trains. Design and Development of Ballastless Track with the indigenous fastening system (BLT-IFS). Design and Development of Rail Free Fastening (RFF) for Girder Bridges. Reduction in de-stressing temperature in LWR with the use of wider and heavier sleepers. Carrying Long Welded Rails through Points and Crossings. Laying of Long Welded Rails in a sharp curve of less than 440 m radius. Design and development of 25T Axle load bogie for different wagons. ==Major achievements==