Rail vehicle shed The main rail vehicle shed is currently under construction nearing completion with a workshop annex having been completed
Locomotives Parts for
NZR WB class locomotives 292 & 299 have been acquired by the Trust where there are being restored to working order.
NZR TR class No. 937 Diesel shunting locomotive has been acquired from KiwiRail and, having been restored, is used for shunting and construction duties.
NZR AB class No.745
North British built Pacific locomotive, makers No. 22880 of 1922. The locomotive was involved in a washout accident on 16 July 1956 and plummeted 50 feet, while hauling a full load of freight from Wanganui to New Plymouth. Both crew survived. Too expensive to recover it remained in situ built into the embankment at
Hāwera. The engine lay undisturbed until November 2001, when it was purchased for $1 by the
Hooterville Heritage Trust, and in 2002 salvage work began after 46 years underground. The raised wreck minus tender was taken to
Waitara. In 2007,
The Taranaki Flyer Society Inc. was formed and AB745 was transported to its new home at the old railway goods shed at
Stratford, where it was being restored. Lack of funds and the loss of the Stratford old railway goods shed led to the Society asking for expressions of interest in the locomotive. The Rimutaka Incline Railway Heritage Trust's proposal was accepted and it was moved to Maymorn in October 2013. Two replica
NZR H class "Fell" locomotives will be commissioned by the Trust to operate the incline section of their line for stage 3 of the project.
Wagons The Trust has acquired 13 YC-class ballast wagons and 2 Q-class coal hopper wagons, currently located at their Maymorn site, and plans to use them in the construction of its line and for ongoing track maintenance.
Carriages The Trust's fleet includes five
NZR 56-foot carriages and one
NZR 50-foot carriage. These vehicles will be restored after the rail vehicle shed is completed.
Maymorn station A heritage-themed station based on the Troup-era Waimate station has been proposed for the Maymorn site. It was hoped to have this building completed by 2015, == Rolling Stock ==