The ore extracted from the
open pit is crushed in a gyratory crusher after being transported and stored in the crushed ore storage facility located within the processing plant site. , the processing plant had a design capacity of 9 million tonnes extracted and processed per year, the process being made on 4 technological lines of 7,500 tonnes per day. The plant was launched between 1983 and 1987. The ore is subsequently processed through a classical processing flow, with a two-stage
grinding phase in two
autogenous mills and in two
ball mills, followed by
flotation, which is performed in
pneumomechanical cells () where the primary concentrate is obtained, which subsequently is flotated in cells of where a
copper concentrate is obtained with a content between 16.5 and 20% copper. The concentrate is thickened in sided thickeners and filtered through a
pressure filter (Larox). == Pollution ==