The diameter of long pipeline system varies between , being primarily . The capacity of the pipeline is . It operates at a maximum allowable operating pressure of . The initial cost of the pipeline was around US$5 billion.
REX Entrega (Zone 1) REX Entrega is the long former Entrega Pipeline between the
Meeker Hub in
Rio Blanco County, Colorado, and the Cheyenne Hub in
Weld County, Colorado. Construction of this pipeline was authorized in August 2005.
REX West (Zone 2) REX West is a long pipeline from Weld County, Colorado, to
Audrain County, Missouri. The first long segment of this pipeline was commissioned on 27 December 2007, and the second long segment was commissioned on 16 May 2008. It is in full service since 16 May 2008.
REX East (Zone 3) REX East is a long pipeline from Audrain County, Missouri, to
Clarington in
Monroe County, Ohio. In June 2014, REX placed the Seneca Lateral into initial service and in January 2015, the Seneca Lateral was placed into full service with the ability to move approximately onto the REX mainline in Zone 3. On August 1, 2015, REX placed its Zone 3 East-to-West Project into service, making Zone 3 of the mainline fully bi-directional with the ability to move approximately of Appalachian production to Midcontinent markets. The diameter of long pipeline system varies between , being primarily .The capacity of the pipeline is . It operates at a maximum allowable operating pressure of . The initial cost of the pipeline was around $5 billion. REX has filed with FERC for a expansion of its Zone 3 east-to-west capacity, via compression additions. This project is anticipated to be completed in Q4 2016. ==See also==