On June 29, 2008, the new Ronald Reagan UCLA Medical Center opened and became fully operational, replacing the older facilities across the street. The older hospital complex had suffered moderate interior structural damage in the
1994 Northridge earthquake. Because numerous hospitals in the area were severely damaged during the Northridge earthquake and injured people had to be transported long distances for emergency care, the state of California passed SB1953, an amendment to an older law requiring all hospitals to move their acute care and intensive care units into earthquake-resistant buildings by 2008. Originally budgeted at $598 million in 1998, construction began in 1999 and was completed in 2004. Cost overruns and construction delays attributed to rising construction costs and design changes due to medical advances resulted in the price of the building increasing to $829 million. Equipment purchased for the new building increased the total cost to over $1 billion. The travertine elements were fastened to a sophisticated interlocking panelized aluminum cladding system developed by Benson Industries of Portland, Oregon. The building envelope is designed to resist and survive severe seismic events and maintain excellent resistance to air and water infiltration. The older center itself is a sprawling 11-story
brick building designed by
Welton Becket. It is considered a landmark of early modern architecture. The center was built in several phases, the first of which was completed in 1953. The hospital has a "
tic-tac-toe" layout of intersecting wings, creating a series of courtyards throughout the complex. The first floor is unusual in that most of its walls are completely clad in a thick layer of naturally-weathered, unfilled,
travertine, creating an unusual "organic" appearance. The exterior architecture is very simple (as with many Becket designs), consisting of a red brick wall with horizontal bands of stainless-steel louvers over the windows to keep direct sunlight from heating the building. Some of the old complex will be torn down, and some of it will be renovated and turned into office space when it is no longer an operational hospital. The law does not require that all parts of a hospital be made earthquake-safe, only the most important parts. Much of the extensive travertine wall cladding from the building's interior will most likely be salvaged and re-used. == Facilities ==