The Ruijin–Meizhou railway is a railway line currently under construction in Jiangxi, China. The line will be 240.3 kilometres (149.3 mi) long and have a maximum speed of 160 kilometres per hour (99 mph). In May 2024, it was expected the line would be completed in 2027.