The SJ&E was originally built to get men and supplies to the
Big Creek Hydroelectric Project sites for the Pacific Light and Power Company (now
Southern California Edison). The track was constructed for $1,055,728 by
Stone & Webster Construction Company of Boston, the project's primary contractor. Grading commenced on February 16, 1912 and construction was completed on December 15, 1912. The 55 mile line started at El Prado (near
Friant where it interchanged with the
Southern Pacific Railroad. The SP branch continued on to Fresno where it intercepted the SP Mainline. From El Prado the line went east to
Auberry and then terminated at Big Creek (Cascade/Cascada). The railroad was known as the “crookedest railroad in the world”. The railroad featured 1073 curves up to 60 degrees. The railroad had 43 wooden trestles and 255 steep grades with the steepest at 5.3%. The railroad was built for the sole reason of building the Big Creek hydroelectric project. When that was essentially complete, the need for the railroad ended. Over the years, it had only earned about 22% of what it cost to build and operate, leading to its nickname "Slow, Jerky, and Expensive. The line was abandoned and dismantled in 1933. The caption on the picture is incorrect. The SJ&E ended at Big Creek. There was an incline that made it to the site of Huntington Lake for dam construction, but the RR proper never went that far. ==Route & Station Stops==