. The statue will be located facing Mumbai's
Girgaum Chowpatty beach, away on a manmade island of rocks. The statue will be total height from base of pedestal to tip of sword: statue of horse and rider with a sword in height, placed on top of a pedestal. Statue was initially planned for 192 metres, however was increased to 212 metres as the state government wanted to keep the statue as the tallest competing against an upcoming statue
Spring Temple Buddha in
China. The project area is planned to be spread over . It is expected to be completed in 2021. Initially the total cost of the project was estimated to be about , but cost-reduction measures have resulted in a contract worth 2500 crores. The completed vision of the project will include visitor centre buildings, a memorial garden, a library, food court, and convention centre with room for approximately 10,000 people. The memorial will also have a museum, exhibition gallery,
amphitheater and
hospital. The memorial will showcase replicas of Chatrapati Shivaji Maharaj's forts. ==Connectivity ==