2016 • Operations were severely affected in September 2016 by the partial collapse of the
Nzi River Bridge, near
Dimbokro. The bridge was repaired in 15 days. • Under Bolloré operatorship Sitarail have acquired • 4 ×
GT26CU-3 clones
NRE CC33201-CC33204 • 4 ×
GT26CU-3 clones
NRE CC33205-CC33208 (contract built by
TŽV Gredelj in
Croatia) •
Grindrod Locomotives are Currently delivering • 5 ×
16-645 powered AC/AC units CC33209-CC33213 • 6 × 700HP shunters (believed to be AC traction) • Six locomotives of an order for 16 ordered from
Grindrod Locomotives for use in
Ivory Coast and
Burkina Faso. The locomotives are numbered CC33201-CC33216. == See also ==