The systems development life cycle (SDLC) describes the typical phases and progression between phases during the development of a computer-based system. These phases progress from inception to retirement. At base, there is just one life cycle, but the taxonomy used to describe it may vary; the cycle may be classified into different numbers of phases and various names may be used for those phases. The SDLC is analogous to the life cycle of a living organism from its birth to its death. In particular, the SDLC varies by system in much the same way that each living organism has a unique path through its life.

Phases
Depending on the source, the SDLC is described as having different phases and using different terms. Even so, there are common aspects. The following attempts to describe notable phases using notable terminology. The phases are somewhat ordered by the natural sequence of development, although they can be overlapping and iterative. Conceptualization During conceptualization (a.k.a. conceptual design, system investigation, feasibility), options and priorities are considered. A feasibility study can determine whether the development effort is worthwhile via activities such as understanding user needs, cost estimation, benefit analysis, and resource analysis. A study should address operational, financial, technical, human factors, and legal/political concerns. Requirements analysis Requirements analysis (a.k.a. preliminary design) involves understanding the problem and determining what is needed. Often this involves engaging users to define the requirements and recording them in a document known as a requirements specification. Design During the design phase (a.k.a. detail design), a solution is planned. The plan can include relatively high-level information such as describing the major components of the system. The plan can include relatively low-level information such as describing functions, screen layout, business rules, and process flow. The design phase is informed by the requirements of the system. The design must satisfy each requirement. The design may be recorded in textual documents as well as functional hierarchy diagrams, example screen images, business rules, process diagrams, pseudo-code, and data models. Construction During construction (a.k.a. implementation, production), the system is realized. Based on the design, hardware and software components are created and integrated. This phase includes testing sub-components, components and the integration of some components, but typically does not include testing at the complete system level. This phase may include the development of training materials, including user manuals and help files. Acceptance The acceptance phase (a.k.a. system testing) is about testing the complete system to ensure that it meets customer expectations (requirements). Deployment The deployment phase (a.k.a. implementation) involves the logistics of delivery to the customer. Some systems are deployed as a single instance (i.e. in the cloud), and deployment may be ad hoc and manual. Some systems are built in quantity and are associated with manufacturing process and commissioning. This phase may include training users to use the system. It may include transitioning future development to support staff. Maintenance During the maintenance phase (a.k.a. operation, utilization, support) development is largely inactive, although this phase does include customer support for resolving user issues and recording suggestions for improvement. Fixes and enhancements are handled by returning to the first phase, conceptualization. For minor changes, the cycle may be significantly abbreviated compared to initial development. Decommission Decommission (a.k.a. disposition, retirement, phase-out) is when the system is removed from use, i.e., when it reaches end-of-life. ==Practices==
Practices
Management and control SDLC phase objectives are described in this section with key deliverables, a description of recommended tasks, and a summary of related control objectives for effective management. It is critical for the project manager to establish and monitor control objectives while executing projects. Control objectives are clear statements of the desired result or purpose and should be defined and monitored throughout a project. Control objectives can be grouped into major categories (domains), and relate to the SDLC phases as shown in the figure. Baselines become milestones. • functional baseline: established after the conceptual design phase. • allocated baseline: established after the preliminary design phase. • product baseline: established after the detailed design and development phase. • updated product baseline: established after the production construction phase. In the following diagram, these stages are divided into ten steps, from definition to creation and modification of IT work products: ==See also==
tickerdossier.comtickerdossier.substack.com