Orientation These dual cab locomotives had a roof access ladder on one side only, just to the right of the cab access door. The roof access ladder end was marked as the no. 2 end. A corridor along the centre of the locomotive connected the cabs which were identical apart from the fact that the handbrake was located in cab 2. A pantograph hook stick was stowed in a tube, mounted below the lower edge of the locomotive body on the roof access ladder side. The locomotive had one square and two rectangular access panels along the lower half of the body and a large hatch door below the second small window to the right of the side door on the roof access ladder side, and only one square access panel and a large hatch door below the first window immediately to the right of the door on the opposite side. The Series 9 to Series 11 locomotives were visually indistinguishable from each other, but could be distinguished from all earlier models by the rainwater drainage holes on their lower sides. These holes were usually covered by so-called buckets, but the covers were absent on a few locomotives. Another distinction was the end doors, which were recessed into the doorframes on Series 9 to Series 11 locomotives, compared to earlier models which had their end doors flush with the doorframes. In addition, on Series 9 and later, the split side window on the driver's assistant side was replaced by a single rectangular side window with rounded corners. Finally, unlike all earlier models, all four doors on Series 9 to Series 11 locomotives had rounded corners.
Crew access The Class 5E, 5E1, 6E and earlier 6E1 locomotives were notoriously difficult to enter from ground level, since their lever-style
door handles were at waist level when standing inside the cab. This made it impossible to open the door from outside without first climbing up high enough to reach the door handle, while hanging on to the side handrails with one hand only. Crews therefore often chose to leave the doors ajar when parking and exiting the locomotives. Side doors with two interconnected latch handles on the outside, such as those which were introduced on the Class 7E1, with one outside handle mounted near floor level and the other at mid-door level, were also introduced on Class 6E1 locomotives beginning with Series 9. ==Service==