}} The company took control of passenger operations on the
Hokkaido Railway Company (JR Hokkaido)
Esashi Line between and following the commencement of operations of the
Hokkaido Shinkansen on 26 March 2016. The line was then renamed the .
Services All services on the Line are Local trains, stopping at every station. Nearly every second train continues through to Kikonai giving a train approximately every 2 hours over the full length of the line.
Stations All stations are in
Hokkaido. Track: ∥: Double track, ∨: Double track ends, ◇: Passing loop |: No passing loop == Sightseeing Train ==