An initial order was placed with
Eastleigh railway works for ten locomotives, with the frames to be constructed at
Ashford railway works and the boilers at
Brighton railway works. However, by the time that Ashford had delivered the first five sets of frames in early 1930 a severe
trade recession meant that they were no longer needed. The frames were stored and the boilers used as spares for the N and U class locomotives. By mid 1931 trade had recovered to allow construction of the initial five to be completed. These were delivered during January and February 1932. The components for the remaining five locomotives still on order were gathered at Eastleigh during 1932, but once again their construction was delayed pending a more sustained economic recovery, and the boilers were used elsewhere. A second batch consisting of these five locomotives together with a further five ordered in March 1930 were eventually delivered between April 1935 and April 1936. Eastleigh works was then committed to the construction of the
Schools class and so the order was transferred to Ashford.
Variations Locomotive Depot 15 February 1958. The two batches differed from each other because the Eastleigh batch had gravity sanding capability and steam regulators on the right hand side, whilst the Ashford batch had steam sanding and regulators on the left, as was common on most other classes of Southern locomotives.
Modifications The first batch was modified between 1959 and 1960 to incorporate steam sanding, as this was already present on the Ashford batch. The right hand driving, however, remained. == Livery and numbering ==