Kelana Jaya Line extension As part of the
Rapid KL LRT Extension Project, the
Kelana Jaya Line was extended by 17 km to through
Subang Jaya and
UEP Subang Jaya (USJ). The Subang Jaya station allows passengers to interchange between the
KTM Komuter network and the LRT. The Kelana Jaya Line extension was opened on 30 June 2016. Passengers wishing to change between the lines need to exit the paid areas of both services as they have different fare collection systems.
Skypark Link extension An 8.15 km branch line of the
Tanjung Malim-Port Klang Line was constructed from Subang Jaya to the
Terminal Skypark Komuter station at
Sultan Abdul Aziz Shah Airport (Subang Airport), providing a rail link to the airport when it opened on 1 May 2018. The service, now known as the
KL Sentral–Terminal Skypark Line, connects the airport directly to
KL Sentral via this station. == Bus services ==