The Missile Support Area included offices of the Base Commander (Col Fred G. Hook, Jr. in 1959), an
OOAMA representative, and the Commander of the
6th Air Defense Missile Squadron; while
Boeing Airplane Company support was from an office north in
Riverhead, New York. Military police operated from a Security Control and Identification building at the Old Country Road entrance to the annex. Two flights of missile maintenance airmen used the Assembly and Maintenance (A & M) Shop for preparing newly received missiles, repairing BOMARCs that malfunctioned, and periodic recycling. "Missile Recycle" for 6 mo/2 yr component replacement from "ready-storage" used 5 A & M Shop stations after the missile had been transported to the Main Shop Room following defueling and warhead removal at the Launcher Shelter and decontamination at the Fuel Facility. The A & M Shop with 22 rooms included a "Control Room", and a Telecommunication (TELCO) Room with 2 SAGE Digital Data Receivers and a Digital Data Transmitter for communicating missiles' status to the remote launch control center in New Jersey.
Interceptor Missile Squadron Operations Center The Interceptor Missile Squadron Operations Center (IMSOC) in the A & M Shop next to the TELCO Room was connected to the "Coaxial Distribution System" for communicating with Electrical Launching Equipment (ELE) in each Launcher Shelter's equipment room. The IMSOC used the "Prelaunch Command System" with a Squadron Supervisor's Station in the IMSOC that included "a desk-type console" with manual controls for acknowledging SAGE "alert orders and other commands". The console controlled missile warm-up (e.g., 2 minutes for IM-99A rocket fuel while 30 seconds was needed for IM-99B: arming of the igniter & activation of gyros, seeker, fuze, etc.) and to maintain the BOMARC at "Standby" (warmed-up & erected) until "Fire-up" by a remote
Senior Director's keyed console (fire button) at the
launch control center (Weapons Director room) at
McGuire DC-01. The console then displayed whether the missile transitioned to the "Launch" or "Malfunction" stage, which determined the subsequent squadron operation needed at the Launcher Shelter (checkout of the empty shelter or deactivation of the faulty missile). ==Civilian use==