The SCB based in
Basel was founded on 4 February 1853 by Johann Jakob Speiser, Achilles Bischoff and Karl Geigy. The shares were mainly owned by Parisian banks. But Basel banks and the
cantons of Basel-Stadt and
Basel-Landschaft were also involved. The issue of
shares worth
Swiss Francs (CHF) 36 million and bonds worth CHF 12 million were planned. Speculation on the Paris stock exchange, however, led to a sharp fall in prices. Thus, the value of the SCB shares fell from CHF 500 to 200 and the share capital finally amounted to only CHF 14.5 million. The
cantons of Luzern and
Bern and Bernese municipalities rescued the company by buying shares and subsidies totaling CHF 6 million. The main goal of the SCB was the construction of a railway network in the shape of a cross with its centre at . Its intention was to forestall
Zürich interests who wanted to build a line via to
Waldshut on the
Baden bank of the
Rhine to Basel. The
Canton of Solothurn initially wanted to grant a concession only for the Hauenstein line to Olten. It wanted to ensure that a direct Olten–– line was built instead of a branch line from
Herzogenbuchsee to Solothurn. The issue of concessions for railway lines in
Aargau was also controversial because there was a fight between the interests of Basel and Zürich in this canton. Zürich and
Neuchâtel planned a link via
Les Verrières to France, competing with the SCB. The canton of Basel-Landschaft refused to issue a concession for a
Bötzberg Railway, which caused considerable disagreement in Aargau. Nevertheless, the SCB finally received a concession for the Olten–
Murgenthal and
Aarburg– sections. The section from to the canton border near Wöschnau was, on the other hand, given to the
Northeastern Railway (
Nordostbahn; NOB). The line crossed the Jura between
Sissach and Olten with gradients of up to 2.6% and passed through the 2.5 km-long
Hauenstein Tunnel from
Läufelfingen to
Trimbach, Switzerland's longest tunnel at the time. Cost overruns and building delays of more than a year brought the SCB close to bankruptcy. CHF 4 million of investment aid from the federal government and bonds worth CHF 12 million from Basel and Stuttgart banks secured further funding in 1857. SCB was able to build lines from via and Olten to , , , and . In 1858, after the construction of the Schanzen tunnel, the SCB network was connected with the NOB network at Aarau. In 1860, SCB's network connected on the cantonal border near Bern with the
Lausanne–Fribourg–Bern Railway (
Chemin de fer Lausanne–Fribourg–Berne) and on
Lake Biel with the
Schweizerische Ostwestbahn (Swiss East-West Railway). In the same year, the
Chemins de fer de l'Est linked its network in Basel with the Central Railway, giving the SCB a direct connection to the international rail network. In there is a stone relief documenting the zero point of the distance measurement of the railway lines prescribed by the Federal Government. From the starting point in Olten, the SCB measured line distances in hours. However, the stone never marked kilometre 0 for the SCB. When the old Swiss measures were metricised in 1877, the Central Railway changed the distance designation of its railway lines. Since then, the metric chainage of the SCB lines has had its starting point in Basel.
Workshop The SCB built its main workshop at Olten station around 1855. This, in addition to the usual maintenance work, also produced new locomotives and freight wagons. The modern SBB workshop emerged from the SCB workshop.
Traffic development SCB's annual reports provide information on the rapidly growing volume of rail traffic on the network. The capacity of the Hauenstein line, at that time the only railway connection from the Rhine Valley to the
Swiss Plateau, proved inadequate after just a few years. The SCB was of vital importance for supplying Switzerland with imported goods such as grain or coal. As a result goods traffic was large and grew steadily. The improvement in the company’s financial situation, led to calls for further expansions of its network.
Railway crisis in the background, around 1870 during the First World War From 1872, the
Swiss National Railway (
Schweizerische Nationalbahn; SNB) tried to establish competition with the existing railway companies with a second rail link between
Lake Geneva and
Lake Constance (
Bodensee). Originally, the National Railway planned a line from Aarau via Olten through the
Gäu to Solothurn and on to
Lyss. Along with the NOB, the SCB made daring commitments to build new lines to fight the competition. In 1872, the SCB entered into an undertaking with the canton of Solothurn to build the
Gäu Railway (
Gäubahn; Olten–Solothurn–Lyss, now considered part of the
Jura Foot Railway), along with the Solothurn–
Biberist branch line (now considered part of the
Solothurn–Langnau railway). In return, Solothurn demanded the creation of the
Waterfalls Railway (
Wasserfallenbahn) from through the
Jura to Solothurn and its continuation from Solothurn to
Schönbühl near Bern. The SCB also committed to build a local railway (
Lokalbahn) from
Liestal to Waldenburg and to participate in the
Sissach–Gelterkinden tramway (
Sissach-Gelterkinden-Bahn), including funding a third of its construction costs. The SCB increased its share capital from CHF 37.5 to 50 million in 1873 to finance the construction of new lines and the duplication of parts of the old network. When
Alsace-Lorraine was ceded to Germany as a result of the
Franco-Prussian War in 1871, attempts were made to build a rail link from
Delle to via and Langenthal (
Jura–Gotthard Railway). In addition, the
Bern-Lucerne Railway (
Bern-Luzern-Bahn; BLB) planned a line to the Gotthard via
Langnau. To defend against this double competition, the SCB began construction of the
Langenthal–Wauwil railway. It would have connected the
Olten–Bern and the
Olten–Lucerne lines and significantly shortened the detour via Aarburg. However, the raising of additional funds was difficult due to the economic crisis and led to significant restrictions on the construction program. The construction of the Waterfalls Railway and the Langenthal–Wauwil line, in which CHF 3.5 million had already been invested, had to be abandoned. The payment of
dividends was discontinued and the net income of 2 ½ years was used to write off the construction costs of the discontinued lines. In 1881, the unrealised Waterfalls Railway cost the SCB the deposit of CHF 125 000 that it had paid for the concession. The construction of the
Waldenburg Railway was left to a special undertaking. The SCB had more success with the joint ventures with the NOB. The SCB together with the NOB built the
Bötzberg Railway from
Pratteln to from 1871 to 1875 and the
Aargau Southern Railway (
Aargauische Südbahn), which connected their lines to the
Gotthard Railway from
Rupperswil via to , operated by the Central Railway, from 1873 to 1882. The opening of these two lines led to a decline in traffic on the Hauenstein line. The construction of the
Basel Connecting Line also occurred in this period. In the
Treaty on the Construction and Operation of the Gotthard Railway, Switzerland undertook to connect its network with the Baden Railways by rail over the Rhine. The Basel Connecting Line was built by the SCB together with the
Grand Duchy of Baden State Railways and put into operation on 3 November 1873. A year before, the section of the
Strasbourg–Basel railway from the French border at
St. Ludwig to the
Centralbahnhof was transferred from the
Chemins de fer de l'Est to the SCB under a federal decree. The
Salinenbahn (Salt Railway) from Pratteln to the
Schweizer Salinen (Swiss salt works) at Schweizerhalle was opened on 28 October 1872.
Recovery and nationalisation Waldenburg Railway, which opened in 1880, shared a section of track with the SCB line to Altmarkt junction using
four rails The opening of the Gotthard Railway gave the SCB a strong boost from 1882 onwards. Both passenger and freight traffic increased strongly and permanently. The SCB received half the profits of the highly profitable Bötzberg Railway. Also, the initially loss-making Southern Railway produced abundant profits from 1882, half of which were paid to the SCB. As early as 1873, SCB was again able to pay dividends to shareholders, which reached nine or more percent of the capital value of shares between 1898 and 1900. These high payments to shareholders shortly before the nationalisation did not meet with approval everywhere. The railway crisis caused many domestic shareholders to sell their shares to domestic and foreign banks. The railway shares played an important role in speculation on the stock market. The new majority of foreign shareholders considered short-term
profit maximisation to be the main priority of the company. In 1887 and 1896, the management was replaced by a president who was more comfortable with the banks. On 30 May 1898, a group of track workers employed by the Swiss Central Railway was run over by a passenger train of the Northeastern Railway at the southern exit from the Gütsch tunnel near Lucerne. Seven railway workers were killed immediately and four seriously injured. On 4 June 1899, the Zurich– night express of the NOB ran past a designated stopping point in Aarau and ran into two stationary Central Railway locomotives. The accident caused two deaths and three serious injuries. In 1891, a banking consortium offered the federal government the majority of shares in SCB. The policy would have had a great impact on the SCB. However, a
referendum was called to prevent the purchase because of its high cost and it was rejected by the voters. The nationalisation of SCB was only decided in 1898 with the adoption of the repurchase law. The Central Railway became the property of the Confederation in 1902 and became part of the
Swiss Federal Railways (SBB). == Infrastructure ==