On 25 January 2019, LTA announced that Teck Ghee station would be part of the proposed
Cross Island Line (CRL). The station will be constructed as part of Phase 1, consisting of 12 stations between
Aviation Park and
Bright Hill, and is expected to be completed in 2030. Contract N109A, which encompasses the design and construction of Teck Ghee station box, was awarded to Shanghai Tunnel Engineering Co (Singapore) at a sum of S$615.9 million in January 2019. Construction started in 2019, with completion in 2026. Contract N107A also includes the design and construction of a section of
North South Corridor tunnel between Sin Ming Avenue and Ang Mo Kio Avenue 3, and relevant commuter facilities. As Teck Ghee station will be superimposed with the North South Corridor and surface road, the station box will be constructed initially, and a subsequent contract will be awarded to complete the station. for the design and construction of Teck Ghee station and associated tunnels was awarded to at a sum of S$xxx million. Construction will start in , with completion in .--> Initially expected to open in 2029, the restrictions on construction works due to the
COVID-19 pandemic has led to delays, and the date was pushed to 2030. ==References==