TIV MPI Resolution

MPI Resolution is a wind turbine installation vessel deployed to install turbines at offshore wind farms. It was the first self-elevating Turbine Installation Vessel in the world. She can raise herself on her six legs between 3 metres (10 ft) and 46 metres (151 ft) above the sea.

Description
MPI Resolution is a 14,857 GT vessel which has six legs that she can use to raise itself out of the sea when installing offshore wind turbines. Resolution is designed for use in the North Sea, although she can be deployed elsewhere if required. She has the capacity for ten wind turbines at a time. The whole ship can be jacked up out of the sea on her six legs, to provide a stable platform when installing wind turbines. The jacking system uses hydraulics. She can raise herself between and above the sea. and two Wartsila 6L20 diesel generators of 1110kW each, powering four Rolls-Royce Aquamaster US 205/3850 azimuth thrusters ==History==
History
Mayflower Resolution was ordered in 2002 by Mayflower Energy Ltd. She was built by Shanhaiguan shipyard, Qinhuangdao, China Mayflower Resolution was built for Mayflower Energy Ltd, part of Mayflower Corporation. Delivery was scheduled for February 2003, Mayflower Resolution was completed in November 2003, and delivered in February 2004. Mayflower Resolution was then put to work installing wind turbines at the North Hoyle windfarm for National Wind Power. The contract ended on 23 March and Mayflower Resolution sailed to Middlesbrough, arriving on 30 March. She was due to depart for Great Yarmouth on 8 April to work on installing turbines for the Scroby Sands wind farm. Deloitte Touche were appointed as administrators. Mayflower Resolution was sold by the administrators for £12,000,000 to a group of Mayflower Corporation's managers who managed to get backing from Japanese bank Mizuho International In 2008, Resolution was used in the construction of the Lynn and Inner Dowsing Wind Farm for Centrica. It was announced in July 2008 that two more ships were to be built, based on MPI Resolution but slightly larger. They will be built by Cosco, at their Nantong shipyard. The two new ships will be named MPI Adventure and MPI Discovery. In February 2008, Resolution was sent to Esbjerg, Denmark to work on the installation of a wind farm. In January 2009, Resolution was used in the construction of the Robin Rigg Wind Farm. In 2010, Resolution was employed in the construction of the 100-turbine Thanet wind farm, off the coast of Kent, United Kingdom, sometimes carrying and installing 9 complete turbines. Resolution also featured in the documentary Mighty Ships, season 2. ==Identification==
Identification
MPI Resolution has the IMO Number 9260134 and callsign PCJM. == See also ==
tickerdossier.comtickerdossier.substack.com