Production from the field will be developed in stages. In the first stage (Tolmount Main) gas is produced by an offshore platform and piped to Easington gas terminal. Later stages will entail development of other parts of the field such as Tolmount East produced back to the platform. Details of the field infrastructure are as shown. The gas pipeline is known as the
Humber Gathering System. It is intended that other prospects in the area, e.g. Mongour, can use the system. In addition to the Tolmount offshore facilities a new gas process facility was constructed at the
Easington terminal to receive and treat the gas prior to shipment into the National Transmission System. == See also ==