The power station has a maximum generating capacity of 382 MW. Water from 3 rivers - the
Sungai Bertam, Sungai Telom and Sungai Lemoi is used for electricity generation. A dam is built to impound the Sungai Bertam. Weirs and diversion tunnels are built on the Sungai Telom and Sungai Lemoi to divert water into the main reservoir at Sungai Bertam. From the reservoir, water is channeled into a series of tunnels 15 km-long to generate electricity before being released back into Sungai Telom. The power cavern houses 2 units of Francis turbines each with a generating capacity of 191 MW. ==Construction==