Urban Extension Road-II (NH-344M) is a 75.7 km long, 6 laned, grade separated expressway in Delhi NCR in India. It begins from National Highway 44 at Alipur then passes from Rohini, Mundka, Najafgarh, Dwarka and end at Delhi–Gurgaon Expressway on National Highway 48 near Mahipalpur. Its main route forms a semicircle on the western side of Delhi, additionally it has two 4-lane side spurs - one from Bawana in Northwest Delhi to Sonipat in Bawana's North and second in west Delhi from between Tikri border & Najafgarh to NH9 Bahadurgarh south bypass.

History
In the year 2000, DDA's NCR Transport Plan 2021 conceived the UER-II project, which did not materialize due to financial viability and land procurement problems. In 2018, NHAI took over the implementation of UER-II phase-1 on payment of INR4000 crore financial viability gap funding by DDA, while DDA itself simultaneously undertook the construction of phase-2. ==Route==
Route
The access-controlled UER-II expressway project phase 1 & 2 have a main 74.98 km long 6-lane semi-circular route on western side of Delhi NCT, with two additional spurs - the 29.6 km long 4-lane Bawana-Sonipat spur in northwest and second 7.3 km long 6-lane Najafgarh-Bahadurgarh spur in west. UER-II is an at grade expressway with elevated flyovers at intersections. • Najafgarh-Bahadurgarh spur (Barwasni Bypass): from UER north of Najafgarh to its northwest to 9 Bahadurgarh south bypass. • Over the Yamuna: • Okhla Head-DLF Mall of India Expressway: from Okhla Head to DLF Mall of India (Noida Film City) on Noida–Greater Noida Expressway. • Sarita Vihar-Amrapali Sapphire Expressway: from Maa Anandmayee Marg, Jyoti Marg, Sarita Vihar, JJ Colony, over the Yamuna, to Raipur Khadar (Noida-Greater Noida Bundh Expressway) and Amrapali Sapphire. • Sirajkund-Palla-Sarita Vihar-Amrapali Sapphire Expressway: from Surajkund-Badkhal Road, Gurukul Road, Tilpat Road, Palla, Vinay Nagar, over the Yamuna, to Chak Basantpur (Noida-Greater Noida Bundh Expressway) and Max Super Speciality Hospital (on Jhansi Rani Laxmi Bai Road in Noida). • Badshahpur-Sirajkund-Palla-Sarita Vihar-Amrapali Sapphire Expressway: from Badshahpur (Mata Amritanandamayi Road), via Dadasiya Tyagi Road and Dadasiya, to Advant Navis Business Park in Noida (Noida-Greater Noida Bundh Expressway and Noida–Greater Noida Expressway). Phase-3: Tuglaqabad-Okhla-Tronica Phase-3 main route: eastern side Badarpur-Noida-Chilla-Okhla-Akshardham-Gurudwara Nanaksar (Sonia Vihar)-Loni-Tronica City (Mandaula) section: Connects Delhi-Dehradun Expressway (Mavikala in north) to Noida (connect to Noida-Greater Noida Bundh Expressway south of Okhla Bird Sanctuary), between the eastern bank of Yamuna and NH-709B. DPR was being prepared for this section in March 2025, which will be ready by Sept-Oct 2025. Phase-3 spursBurari-Loni-Ghaziabad-Okhla - North Delhi-Ghaziabad inner loop: will pass through Khanpur Japti, Loni, south of Hindon Airport, Chaudhary Charan Singh Marg (Bhopura, Saheed Nagar, Kaushambhi & Ghazipur), and via Ghazipur Road to DND Flyway. • Agraula-Jawli-Ghaziabad Expressway - North Delhi-Ghaziabad outer loop: Alipur-Burari-Agraula will continue to Jawli and then to NH9 Morti interchange in Ghaziabad where it will meet Faridabad-Noida-Ghaziabad Expressway (FNG). Phase-4: Tronica-Alipur Phase-4 main route: northeastern quadrantAlipur-Burari-Agraula-Expressway: 17 km extension of UER-II from NH44 Alipur at Splash Water Park, via Hiranki & then along Bund Road, then Burari bridge over Yamuna river to Agraula (Tronica City) where it will connect to Delhi–Saharanpur–Dehradun Expressway and NH709B. DPR was being prepared for this section in March 2025, which will be ready by Sept-Oct 2025. ==Current status ==
Current status
Phase-1 Alipur-Bahadurgarh-Najafgarh-IGI - completed and operational. Entire UER-II Phase-I 75.7 km Alipur-IGI became operational on 17th August 2025. • Phase-2 IGI-Vasant Kunj-Tuglaqabad: under-construction. June 2025 - DPR ready. • Phase-3 Tuglaqabad-Okhla-Tronica: under-construction, partially operational. June 2025 - Delhi-Dehradun Expressway section complete, some sections including bridge over Yamuna near Tuglaqabad and Expressway along Yamuna from Okhla Bird Sanctuary to the beginning of Delhi-Dehradun Expressway under-construction. • Phase-4 Tronica-Alipur: under-construction: June 2025 - Tender for preparation of DPR floated. • Phase-5 FNG and GTE: under-construction. • See FNG & GTE current status: UER-II Phase-1 and Phase-2 form the northwest and southwest quadrants, UER-II Phase-3 and Phase-4 form inner southeast and northeast quadrants of the third ring road around Delhi. Whereas the FNG (Faridabad-Noida-Ghaziabad) and GTW (Ghaziabad-Hindon Airport-Loni-Tronica-Agraula) form the outer southeast and outer northeast quadrants of another ring expressway around Delhi. ==See also==
tickerdossier.comtickerdossier.substack.com