YFD-71 was built by the
Pollock Shipbuilding Co., in
Stockton,
California in 1945. She would be
commissioned later in 1945 after her delivery to the Navy on 1 July. On 1 April 1986, was seen dry docked inside
Steadfast at
National Steel and Shipbuilding Company. In February 1987,
USS Bagley (FF-1069) traveled to
Concord Naval Weapons Station where she unloaded ammunition before beginning a restricted availability at
San Diego on the 16th. The repair period lasted until early summer and included a seven-week drydocking in
Steadfast that occupied most of April and all of May. In January 1992, was dry docked inside
Steadfast. On 15 March 1994, began a six-month selected restricted availability at Continental Maritime in San Diego, which lasted from 15 March until 19 May in the floating dry dock
Steadfast. On 8 January 1996,
Steadfast was dry docked at
Long Beach Naval Shipyard.
Steadfast was
decommissioned in 1998 and sold to
BAE Systems Ship Repair San Francisco, renamed
Eureka. Struck from the
Naval Register on 7 February 1999. On 2 January 2017, the shipyard was sold to Puglia Engineering, Inc. == Awards ==