29 March 1986: First section of railway reopened between Maldon station and the Bendigo Road crossing (approx. 1 km). The reopening train consist being K160-2BCE-42BU-16BCPL.
1987: Diesel locomotives F212 and T333 acquired from VicRail. F212 was transferred from Melbourne to Maldon by road. T333 was railed from Bendigo to Maldon.
31 March 1991: Locomotive J549 makes its first move under steam and returned to service later that year.
9 October 1993: Railmotor 61RM officially handed over to the VGR. It had been held by a group of railmotor drivers at Spencer St prior to being railed to Bendigo and then trucked to Maldon.
25 September 1995: Locomotive D3 646 retrieved from a park outside Maryborough Railway Station.
8 June 1996: Line officially reopened to Muckleford. J549 was used on the official train.
11–12 July 1998: First heritage rail weekend, promoted as "Steamfreight '98". A variety of passenger, goods and mixed trains ran with K160, J549, T333, F212 and 61RM over the 2 days.
July 1999: "Steamfreight '99", the 2nd such event held. A similar program of operations to the previous one. Highlights included K160 being renumbered K157 on the Sunday. A triple headed goods also operated with "K157"-T333-F212.
May 2001: "Steamfreight 2001", the 3rd such event to be held. K160, J549, T333 and 61RM operated. 2 L type sheep wagons were transferred by road from the collection at Castlemaine and restored for this event.
19–20 June 2007: The VGR held a Steam on Show Event using J515, K160 & diesel Y133. A variety of passenger, goods and mixed trains operated from Maldon to Castlemaine on the 19th, while regular services ran as mixed trains headed by K160 and J515 on the 20th.
26 July 2008: The VGR ran the first double-headed J Class working in thirty years, using J515 and J541.
6 September 2008: The VGR held the first "Picnic at Muckleford" event, combined with Steam on Show. The major highlight of this event was the first triple headed steam on the VGR (and the Castlemaine-Maldon branchline) with K160-J515-J541. A variety of passenger and mixed trains ran throughout the day.
14 June 2009: The VGR celebrated the 125th anniversary of the Castlemaine-Maldon line with a special train from Castlemaine hauled by doubled headed J class.
Steamrail Victoria operated double headed R class from Melbourne as part of the festivities.
19 December 2010: E cars 2BCE, 20BE, 15BE & 18AE, were sold to the SRHC & transferred from Maldon to Seymour for restoration.
29 October 2011:
Steamrail Victoria locomotive K190 transferred by rail from Melbourne to Maldon to provide back-up motive power. It left the railway on 9 March 2012. It returned for a second period of hire on 23 October 2012 and left on 23 June 2013.
26 November 2011: Another "Steam on Show" event was held. K190-K160 ran a special mixed train from Maldon to Muckleford with K190 leading tender-first and K160 trailing funnel-first. At Muckleford K160 ran around the train to form a tender-to-tender formation for the run to Castlemaine. The return from Castlemaine was run as a double-header with K190 leading K160.
12 May 2013:
Diesel Electric Rail Motor Preservation Association Victoria ran a special from Melbourne to Maldon and return with 58RM. It was the first time a passenger train has operated such a trip since the last VR train on the Maldon line in November 1976. The railmotor crossed J515 operating the regular VGR service in both directions.
23 June 2013: D3 639 arrived at Maldon by rail from Melbourne on loan from
Steamrail Victoria, making it the first time a D3 has traveled on the branch in forty years. On the same day, Y133 was transferred to Melbourne for repairs.
18 August 2018: In conjunction with Steamrail's Maldon weekender. K153, J549 and K190 hauled one of the largest and heaviest trains to run on the VGR. With 6 sleeping carriages, a power van, water gin, Lowanna, the VGR 4 wheel goods set and Y133 hauled dead. This was the first triple header on the VGR in over 10 years. ==Maldon station fire==