The
Boston and Albany Railroad opened through Natick in September 1834. On August 23, 1982, the
MBTA opened
West Natick station to ease demand at Natick and Framingham stations. The station should have been built
accessible (state accessibility laws date from the 1970s, long before the 1990
Americans with Disabilities Act), but it was not due to a budget shortfall. Accessible mini-high sections were installed around 1993. In early 2016, the
mini-high accessible platforms were closed because the folding platform edges were deteriorated, risking a dangerous collapse like one that happened at
North Billerica station in 2015. The mini-high platforms were demolished in March 2017; new composite platforms opened that November. The adjacent Boden Lane bridge was closed on October 31, 2019, after it was damaged by brush-clearing equipment. On November 5, MassDOT announced that the bridge would be permanently closed and replaced. The bridge was removed in December 2019; a temporary pedestrian span opened on January 27, 2020. Solar panels over the parking lots were added in 2021. In June 2021, the MBTA issued a $28 million design contract for a project to add a third track from Weston to Framingham, including reconstruction of the three Wellesley stations and West Natick station. The project was expected to cost around $400 million, of which rebuilding West Natick station would be $37 million, with completion in 2030. ==References==