Woldgate School was first built in the 1950s, and was expanded multiple times with new buildings being added between then and the 2000s. In 2021, the school was selected by the Department for Education to be part of the School Rebuilding Programme. Wates Construction, a national construction company, was selected by the Department for Education to design and build the new school site. The redevelopment plan sees most of the existing buildings demolished, with the exception of the existing music block which is being retained and incorporated into the new site. This music block was built in the 2000s using a grant which the school received after it was awarded
specialist status; the building includes a recording studio, rehearsal rooms, classrooms and a dance studio. Work on the site began in March 2023, with the demolition of the first existing block. Soon after, work on the brand-new Main Teaching Building began. In November 2025, the school moved into the new Main Building, which includes an auditorium, food court, library, laboratories, computer suites and classrooms. The demolition of all other existing buildings is underway. The construction of the new Sports building has begun and is scheduled for completion in late 2026. The existing music block will also be receiving refurbishment work over the coming months. The site’s redevelopment also includes an increase of coach and car parking and associated landscaping. The redevelopment was planned in such a way that is ensuring the continuity of facilities for the school during the build process, without the need for temporary accommodation. The new school buildings are designed to be Net Zero Carbon in Operation and rely heavily on solar energy. The project’s overall completion date is May 2027. == Notable former pupils ==