The route was introduced on 25 October 2020 by
Hulleys of Baslow. In May 2021, the route was extended from Manchester Chorlton Street to
Manchester Airport. In September 2021, Hulley's announced plans to extend the route to
Macclesfield, however the planned extension was cancelled due to driver shortages. The service was eventually withdrawn due to low passenger numbers. The final day of operation of the X57 was 9 January 2022. Hulleys' 257, which ran parallel to the X57 between Sheffield and
Bakewell via the
Ladybower Reservoir, was increased to an hourly frequency with a £1
flat fare as a partial replacement of the route. == Route ==