Yamal project

The Yamal project, also referred to as the Yamal megaproject, is a long-term plan to exploit and bring to the markets the vast natural gas reserves in the Yamal Peninsula, Russia. Administratively, the project is located in the Yamalo-Nenets Autonomous Okrug.

History
Preparations for the Yamal's development started in the 1990s. According to the original plans, drilling work on the Bovanenkovo field was to have started in 1997. The project was officially inaugurated on 3 December 2008. ==Oil and gas fields==
Oil and gas fields
As of 2008, Gazprom listed 11 gas fields and 15 oil, gas and condensate fields on the Yamal Peninsula and the Yamal shelf in the Kara Sea. They consisted of 16 trillion cubic meters (tcm) of explored and provisionally evaluated gas reserves, and nearly 22 tcm of in-place and forecast gas reserves. Estimated condensate reserves were 230.7 million tonnes; estimated oil reserves were 291.8 million tonnes. The largest gas fields for which Gazprom owns the licenses were the Bovanenkovo, Kharasavey, Novoportovo, Kruzenshtern, Severo-Tambey, Zapadno-Tambey, Tasiy and Malygin fields. Bovanenkovo gas field The Bovanenkovo gas field is the largest gas field on the Yamal Peninsula with estimated reserves of 4.9 tcm. Yamal LNG In November 2008, Gazprom announced that it had a list of potential partners for the Yamal LNG project. Ultimately however Novatek was the principal shareholder, and commercial operation started in December 2017 with the loading of the first LNG carrier. ==Transport==
Transport
The Obskaya–Bovanenkovo railway was opened in 2011 to provide all year access to the Bovanenkovo gas field. The port at Kharasavey gas field can be used in the summer. The gas fields are also served by the Bovanenkovo Airport . The Arctic Gate offshore oil loading terminal is located in the Gulf of Ob, designed to operate where ice could be over two meters thick. ==Trunk pipelines==
Trunk pipelines
A joint project (Yamal-Europe pipeline) between gas transportation companies of Russia, Belarus, Poland and Germany was agreed in 1993 and commissioned in 1999. After commissioning of the Bovanenkovo–Ukhta gas trunkline it will deliver Yamal's gas to Europe. Construction of this pipeline started in July 2008 and was officially launched on 3 December 2008. The shortest pipeline routes from Yamal to the northern EU countries are the Yamal–Europe pipeline through Poland and Nord Stream 1 to Germany. ==See also==