YEC
generates virtually all of Yukon's electricity supply, and distributes power to a third of the locations outside of
Whitehorse. Their largest customer (a wholesale buyer) is the
Yukon Electrical Company (YECL), a private business that has been operating since 1901, which itself has some smaller hydro operations, and serves primarily the Whitehorse area plus two thirds of the rural communities. YEC itself provides customer electricity directly in Dawson City, Mayo, Faro, Champagne and to some isolated individual customers. YEC has developed a grid that connects
hydro facilities in
Whitehorse (
Schwatka Lake Dam - 40 MW from four wheels, the fourth added in 1983),
Aishihik Lake - 30 MW, and the YECL facilities at Fish Lake near Whitehorse. The communities on the "Whitehorse-Aishihik-Faro" grid include Whitehorse,
Champagne,
Johnson's Crossing,
Faro, and the following communities where it is distributed by YECL:
Haines Junction,
Carcross,
Tagish,
Marsh Lake,
Teslin,
Carmacks and
Ross River. YEC operates two wind turbines on Haeckel Hill near Whitehorse connected to the Whitehorse-Aishihik-Faro grid. The first turbine is a Bonus Energy 150 kW MARK III installed in 1993. The second turbine, a
Vestas 660 kW V47 LT II was later installed in 2000. These units need to be specially adapted to deal with icing and the northern environment. A second grid, brought on-line in 2004, connects
Dawson City (reliant on diesel power from 1966 to 2004) via
Stewart Crossing to
Mayo, and beyond to the YECL-served communities of
Elsa and
Keno City, all drawing on the 5 MW hydro facility just north of Mayo that had mines at Elsa as primary customer until 1989. The government of
John Ostashek (1992-1996) had promised to connect Mayo, Stewart Crossing and YECL-served
Pelly Crossing to the main southern grid at Carmacks. During their mandate, and the subsequent N.D.P. and Liberal party mandates, this project was not developed, and Pelly Crossing remained on its own YECL diesel generator. The project was finally proceeded with during the later part of the 2000s, partly to meet power requirements for mines in the Minto area, and on June 17, 2011, the two grids began to operate together. The YECL generator at Pelly Crossing is now on standby to the grid. Off the grid, Yukon Electrical Company Limited operates diesel generators to serve its customers in
Watson Lake-Upper Liard, Swift River,
Burwash Landing,
Destruction Bay,
Beaver Creek and
Old Crow. The possibility of a grid connection to
Atlin, British Columbia has probably been eliminated by a decision to construct a hydro project near Atlin, but talk in Atlin of an expansion could still raise that possibility. Yukon has no connections to the continental power grid, therefore, YEC cannot sell to or buy from networks in
Alaska,
British Columbia,
Alberta or the
Northwest Territories. In addition to the extreme expense of such transmission lines, they would also be subject to disruption from
solar flares. ==Electrical Service by Community==