Construction From the late 19th century, there had been proposals to build a bridge across the Tagus. In 1929, the idea advanced when the Portuguese engineer and entrepreneur, António Bello, requested a government concession for a railway crossing between Lisbon and
Montijo (where the
Vasco da Gama Bridge, the second bridge serving Lisbon, was later built in 1998). As a result, the Minister of Public Works,
Duarte Pacheco, created a commission in 1933 to analyse the request. The commission reported in 1934, and proposed building a road and rail bridge. Bids were obtained, but the proposal was subsequently put aside in favor of a bridge crossing the river at
Vila Franca de Xira, north of Lisbon. In 1953, a new government commission started work and, in 1958, recommended building the bridge, choosing the southern anchor point adjacent to the recently built
Christ the King monument (
Cristo-Rei). In 1959, the international invitation to tender for the project received four bids. In 1960, the winner was announced as a consortium headed by the United States Steel Export Company, which had also submitted a bid in 1935. The
American School of Lisbon was founded largely to educate the children of the American engineers brought to Portugal to work on the construction of the bridge. Construction began on 5 November 1962. Forty-five months later, six months ahead of schedule, the bridge was inaugurated on 6 August 1966. Presiding at the ceremony was the
President of Portugal, Admiral
Américo Thomaz. Also present were the
Prime-Minister,
António de Oliveira Salazar, and the
Patriarch of Lisbon, Cardinal
Manuel Gonçalves Cerejeira. The bridge was named Salazar Bridge (
Ponte Salazar), after Prime Minister Salazar. United States Steel International Inc., based in New York, was prime contractor for the bridge. Morrison-Knudsen of Portugal Ltd., an American firm based in Boise, Idaho, was U.S. Steel's principal associate. Morrison-Knudsen had previously worked on the San Francisco Bay Bridge. The bridge was designed by Steinman, Boynton, Gronquist and London of New York, and Tudor Engineering Company of San Francisco. The steel was imported from the US. Four workers died, out of a total of 3,000 who worked on the site. Construction took a total of 2,185,000 man-hours of work. The total cost of the bridge came to 2.2 billion
Portuguese escudos, or US$32 million (US$225 million in 2011 adjusted for inflation). Soon after the
Carnation Revolution in 1974, the bridge was renamed the "25 de Abril Bridge", the day the revolution had occurred. A symbol of those times was captured on film, with citizens removing the large brass letters spelling "Salazar" from one of the main pillars of the bridge and painting a provisional "25 de Abril" in its place.
Expansion The upper platform, running above water, had four car lanes, two in each direction, with a dividing guardrail. On 23 July 1990, the guardrail was removed and a fifth,
reversible lane was created. On 6 November 1998, the side walls were extended and reinforced to make space for the present six lanes. Cars crossing the bridge make a peculiar hum - [//upload.wikimedia.org/wikipedia/commons/7/7b/Under_Bridge_25_April_Lisbon.ogg listen (59s)] - because the two inner lanes are made of metallic grating rather than asphalt to minimize aerodynamic forces by means of pressure equalization. Since 30 June 1999, the lower platform has carried a double track railway. To accommodate that, the bridge underwent extensive structural reinforcements, including a second set of main cables, placed above the original set, and the main towers were increased in height. The railway had been part of the initial design, but was eliminated for economy, so the initial structure was lightened. The original builder
American Bridge Company was called again for the job, performing the first aerial spinning of additional main cables on a loaded, fully operational suspension bridge. Traffic soon increased well beyond predictions, and has remained at maximum capacity despite the enlargement from four to six lanes, the addition of the railway, and the building of a second bridge serving Lisbon, the
Vasco da Gama Bridge. A
third bridge has been on and off government plans for some time, but in May 2024 the government announced to prioritize building this new bridge as part of the new
Lisbon-Madrid high-speed rail line, to be finalized in 2034. ==Popular culture==