Tallyho (1962–1963) The English
Tudor-styled Tallyho hotel was conceived by owner
Edwin S. Lowe, a New York toy manufacturer who also served as the president of the hotel. In May 1962, the Clark County Ground Water Board denied an application for a water well that would be used for a nine-hole
pitch and putt golf course, which Lowe planned to construct at the rear of the property. A nine-hole golf course was ultimately added to the final plans. Simultaneously, county officials discovered that the three-story stucco hotel may be in violation of fire codes. A request was made for the owner to propose plans to fireproof the hotel's wooden roof and attic. County officials suggested the installation of either a sprinkler system or
sheet rock in the attic, as well as the addition of fire-proof materials on the roof of the hotel structures. In November 1962, key positions in the resort were being named while an opening date of Christmas week was being planned. The Tallyho Hotel and Country Club opened on December 24, 1962, at a cost of $12 million. Grand opening celebrations were held in February 1963. It was the only major resort in Nevada to not include a casino. The hotel featured 450 rooms, 32 villas, six restaurants,
horseback and bicycle-riding facilities, and a helicopter service to take guests to nearby attractions such as
Mount Charleston and
Lake Mead. However, the Tallyho closed on October 10, 1963, because of low revenue caused by the lack of a casino. and reopened it as the King's Crown Tallyho on November 5, 1963. Kings Crown planned to add a casino and showroom as soon as possible. Lighting and sound system details for the showroom were being finalized in March 1964, while Kings Crown planned to have the showroom opened in the summer. Sound men who designed the showroom consulted with sound engineers at the
University of California, Los Angeles. Film producer Steve Parker, husband of actress
Shirley MacLaine, was named as the head of the hotel's showroom, to be named the Crown Room Theater-Restaurant. In addition, Parker was named as a part owner in the resort. In April 1964, a fire started in one of the hotel rooms and caused smoke damage to part of the hotel. The fire was believed to have been started by a cigarette.
Groundbreaking ceremonies for the casino and showroom were scheduled for the weekend of April 11–12, 1964. Celebrities, including MacLaine, were expected to attend the ceremonies. Other additions in the $3 million expansion project would include a convention hall and another restaurant. Future plans included the addition of a 15-story hotel structure with 500 rooms. By the end of 1964, a partnership of six corporations, with a total of 17 stockholders, was seeking a gambling license to open the casino as part of a $500,000 investment. On December 22, 1964, the
Nevada Gaming Control Board deferred action on the approval of a gambling license until the following month to allow time for an investigation of the partnership's finances. A New Year's Eve opening date had been planned for the casino, while the possibility remained for a showroom lounge and two new restaurants to open at that time, although they ultimately did not. but agreed to the hotel's request to delay action for another 30 days so financial agreements could be worked out between people in the partnership. By that time, the partnership consisted of 18 people with a total investment of $800,000. The request for a gambling license was withdrawn in March 1965, to allow more time to reorganize the partnership. Later that month, a suit was filed by Kings Crown Tallyho Inn Incorporated, Equitable Real Estate Investment Trust, and Fidelity Real Estate Investment Trust, all of which requested that the present leasees of the hotel be removed for not paying $632,000 in rent and other payments. The companies stated that other groups were interested in taking over the resort as soon as the leasees, including Chuck Luftig and Edward Nealis, could be removed. Phone service to the hotel was cut off in April 1965, due to unpaid phone bills dating back to January. All 50 non-permanent guests were asked to leave the hotel. Luftig and Nealis were removed as lessees at the end of the month, after a judge ruled that the hotel be vacated and returned to Kings Crown. The next month, Luftig and Nealis asked for a $3.3 million judgment, alleging that Kings Crown failed to finish necessary improvements to the property during the period of August 1964 to January 1965, leading to financial losses.
Aladdin (1966–1998) On January 1, 1966, Prell announced plans to remove the old English theme and reopen the resort as the
Oriental-themed Aladdin on April 16 following an extensive $3 million renovation. Prell also planned to construct a $20 million, 40-story hotel addition with 600 rooms. Construction of the high-rise was expected to begin later in the year.
Martin Stern Jr. was the architect for the Aladdin project, while R. C. Johnson and Associates was the contractor and was hired to construct new facilities and renovate existing structures. Renovation plans included the remodeling of the showroom and lounge, as well as the casino and the hotel's front side. Elevators and escalators were also installed at the hotel's two main front entrances. Later in the month, Prell requested a gambling license to operate 27 table games and 350 slot machines, with casino operations to be financed at a cost of $400,000 through Prell and his partners, Gil Gilbert and Sidney Krystal. Prell owned a 20-percent interest in the hotel corporation, while Gilberts, the corporate vice president, held five percent and Krystal, secretary-treasurer, had seven percent. A large group of investors owned the remaining stock. The Gaming Board recommended approval of Prell's request for a gambling license in February 1966. Prell was approved the next month for gaming and liquor licenses, with approval to operate 351 slot machines and 29 table games.
Opening and ownership changes The resort opened as Milton Prell's Aladdin at midnight on April 1, 1966, becoming the first major resort to open on the Las Vegas Strip in nine years. The Aladdin included the largest casino on the Las Vegas Strip and the 500-seat Bagdad Theatre. People present at the grand opening included Prell and his wife, as well as County Commission Chairman
William H. Briare, Las Vegas mayor
Oran K. Gragson, and
Las Vegas Sun publisher
Hank Greenspun. The Aladdin, located on , included a golf course and five dining facilities. The Aladdin was considered one of the most luxurious resorts on the Las Vegas Strip, although profits were usually low. Construction of the high-rise hotel addition was scheduled to begin in October 1966. At the end of 1966, Prell stopped making payments to the trusts, stating he could not afford the overall $10 million sale price. The trusts agreed to reduce the sale price to $5 million, In May 1967, the Aladdin was host to
Elvis and
Priscilla Presley's wedding. In 1968, MK Investment Corporation made a failed offer to purchase the Aladdin. Gardner was a former executive at the
Binion's Horseshoe in
downtown Las Vegas, and his group included six unnamed investors. In May 1971, Recrion granted the group an extension in order to raise the money to complete the purchase. The deal was cancelled later in the month after Gardner failed to make the purchase, which resulted in Recrion filing a $250,000 suit against Gardner. By the end of 1971, Recrion was planning a $5 million sale of the Aladdin, which would help pay off the resort's debts. The Aladdin was sold to Sam Diamond, St. Louis politicians Peter Webbe and Sorkis Webbe, and St. Louis attorney Richard L. Daly for $5 million. Under the new owners, a $60 million face lift was conducted, including the addition of a 17-story tower and the new 7,500-seat Performing Arts Center replacing the golf course, which was $4 million over budget. A $250,000
porte-cochere continued the tower's
arabesques. The Aladdin added a new $300,000 blockbuster sign with little
neon, huge attraction panels and none of the arabesque of the Aladdin's original sign. The Aladdin celebrated the grand opening of their new "
Aladdin Theatre for the Performing Arts" with singer
Neil Diamond being paid $650,000 for four shows; July 2 through July 5, 1976. In 1981, heavy metal band
Iron Maiden played at the Aladdin – it was their first-ever concert in America. In August 1979, several individuals were convicted by a Detroit Federal Jury of conspiring to allow hidden owners to exert control over the resort, and the Nevada Gaming Commission then closed the hotel. The resort was sold to
Wayne Newton and Ed Torres in 1980 for $85 million, snubbing an offer from comedian
Johnny Carson. Newton sold his share to Torres 21 months later. Newton sued
NBC, who had alleged in broadcasts, that his purchase of the Aladdin was tied to the mafia. He won a $22.8 million judgement, which was overturned on appeal. Yasuda was removed as the casino's operator by state regulators in September 1988. Yasuda placed the resort in Chapter 11 bankruptcy in October 1989, and died two months later. The property was publicly put up for sale in 1990, after months of unsuccessful private attempts to locate a buyer. Later in 1994, Jack Sommer, a Las Vegas real estate developer, and the Sommer Family Trust purchased the hotel. The Sommer Family Trust owned the Aladdin through Aladdin Gaming Corporation – which also operated the resort – and Aladdin Holdings LLC. In May 1996, plans were approved by the
Clark County Commission for a $600 million renovation and expansion of the Aladdin, which had 1,100 hotel rooms at the time. Sommer and the county spent six months working on the design of the project, which would retain the original hotel tower and theater. The expansion would include four new hotel towers, including a centerpiece 400-foot-high rectangular tower. Other additions would include a 256-room timeshare condominium, a 300-room hotel-casino, and a shopping mall that would be co-managed by
Eddie DeBartolo. The hotel would continue operations during the expansion project, which was expected to take 24 to 30 months. On December 6, 1996, American
psychedelic rock band
Phish performed at the Aladdin, marking the first appearance in Las Vegas by the band. The performance was ultimately released as a CD/DVD release entitled
Vegas 96. The concert featured a guest appearance by members of the band
Primus and a group of
Elvis impersonators. In January 1997, Aladdin Gaming Corporation announced that
London Clubs International would invest $50 million for a 25 percent interest in the Aladdin resort. London Clubs planned to add a luxury gaming facility to the Aladdin, aimed at attracting
high rollers. The new facility would include 30 gaming tables and 100 slot machines. It would be part of the two-year renovation and expansion project, which was expected to cost $750 million and was scheduled to begin later in 1997. The new gaming facility would feature a European design. The Aladdin had been struggling to compete against larger resorts on the Las Vegas Strip. In March 1997, Aladdin Holdings announced that the resort would add a shopping mall as part of the expansion project. It would feature the Aladdin's Arabian theme and was expected to open in 1999, with
TrizecHahn Corporation handling construction, leasing, and operations. The mall, to be known as
Desert Passage, was expected to cost $210 million. For the expansion project, Jack Sommer considered various options, which included closing the resort to renovate it, and demolishing the resort entirely to build a new one.
Closure and demolition On September 25, 1997, it was announced that the Aladdin would close in two months and eventually be demolished to make room for a new Aladdin resort that would be three times larger than the original, and would include the Desert Passage mall. The Aladdin had 1,485 employees, while the new resort would employ over 7,000 people. The Aladdin's 7,000-seat Theater for the Performing Arts would be retained and modernized for the new resort. Among the final performances in the Aladdin theater was
Jane's Addiction. Few casino guests expressed sadness about the closure. Demolition was expected to begin in December 1997, and an
implosion of the hotel tower was expected to occur in February 1998. In February 1998, Aladdin Gaming announced that it had financed plans for the new Aladdin resort, expected to cost $826 million. National Content Liquidators conducted an on-site liquidation sale of the Aladdin beginning on March 6, 1998. On April 27, 1998, the hotel tower was imploded at 7:27 p.m. to make way for construction of the new Aladdin resort. It was the fifth Las Vegas resort to be imploded. The tower was imploded by
Controlled Demolition, Inc., who had handled every hotel implosion on the Strip to this point. According to company president Mark Loizeaux, the tower used a poor
concrete block design. He said, "This is the worst construction I've ever seen. It's shoddy. It's a poor man's high-rise. It is extremely susceptible to collapse. It is not a building I'd want to be in in an earthquake". The design meant that bringing down the tower in the implosion would be easy, but it also posed a challenge for getting the building to come down in the right direction. Because the tower would be easy to bring down during the implosion, Loizeaux decreased the amount of explosives from 370 pounds to 232 pounds. The old resort's sign read, "Out of the dust Aladdin rises anew. See you in 2000."
Frank Wright, the
curator of the
Nevada State Museum, said about the Aladdin's lack of success: "I don't know why it never made it. It never had the glamour of the
Sands or the exotic dancers of the
Tropicana or the
Dunes or
Stardust. Maybe it was location, but the
Hacienda was farther out, and it was a success." Don Payne, the former chief of the
Las Vegas News Bureau, said the Aladdin "certainly couldn't match the
Flamingo or the Dunes. It never had the big name entertainment policy. It didn't have the advertising the big guys had. But it was a well-thought-of place."
New resort (since 2000) The new Aladdin resort opened in August 2000. It experienced financial problems and entered Chapter 11 bankruptcy protection in September 2001. In February 2002, Aladdin Gaming was searching for potential buyers. The resort was sold in bankruptcy on June 20, 2003 to a partnership of
Planet Hollywood and
Starwood. After a renovation, the resort began operating in 2007 under the name "Planet Hollywood". ==Film history==